High school renovation on schedule as middle school plans take shape

(click photo to enlarge)

  • A portion of the historic high school is incorporated into the high school's new east-side entrance.

  • The new water fountains will each have water bottle filling station.

  • A small theater, capable of holding 125 people, is just off the new east side entrance.

  • Equipment and flooring for the new gym are installed.

  • Large windows let in ample light in the new cafeteria.

  • Classroom spaces are also filled with light.

  • A classroom space.

  • The cafeteria.

  • An interior corridor.

  • The gym from the balcony.

  • The multi-story entrance near the field.

  • The pool.

  • Science equipment.

  • The auditorium.

  • A view of the field from a second-story classroom.

Back to Article